Anaerobic-Digestion-header-s

We are UK based but with worldwide interests as champions of AD technology.

 New! Anaerobic Digestion Community Forum
Please give us Feedback
Click below!

Last updated:
 

Visitors:
 

Advertisement:

Enviros Consulting - Environmental - Independent. High Client satisfaction according to surveys.
Do you have an Anaerobic Digestion related project?

Click here to find out about the comprehensive Enviros service
in AD.

 

Biogas-Methane-Explained-Cover

Free!
eBook Download:

Biogas Methane Explained & Other Articles

Regulatory Requirements for On-Farm AD Plant Installations

The following applies to united Kingdom requirements. Always check you local requirements with your local authority and regulator as appropriate.

 

Planning Consent

Planning consent is likely to be required for all anaerobic digestion plant installations, and it is advisable to consult with your local planning department at an early stage.

The Town and Country Planning Regulations will apply much as they would for any industrial plant. The Centralised Anaerobic Digestion (CAD) plant applications being for larger sized installations than On-farm Plants, will have to provide more detailed information than will be required for smaller on-farm plant applications.

The applicant will be required to provide detailed justification that community (centralised) anaerobic digestion schemes are suitable for the proposed location, with impact assessment information based upon a detailed understanding of the controls on emissions which will be provided for the plant.

The Local Authority Planning Department will determine the application and consultation with local residents and neighbours with education and awareness aimed at planning officers and locals can be highly beneficial.

The Kelly Review has been examining the case for making the planning system more effective towards delivery of expansion the nation’s waste management facilities. It is not known at the time of writing what the outcome of this review will be. However, unless and until there are changes, the requirements should be considered to be really quite onerous for Anaerobic digestion plant applicants.

Environmental Permitting to Operate Anaerobic Digestion Plants

Centralised anaerobic digestion schemes are subject to the EU Pollution Prevention and Control (PPC) Regulations. This was originally known as PPC permitting, or IPPC permitting.

In addition, in some circumstances Waste Management Licences have also historically also applied to Anaerobic Digesters.

To simplify environmental regulation the Environment Agency, England and Wales, now regulates both sets of Regulations under the term “Environmental Permitting”.

Those applying for an Environmental Permit will, once successful, be in possession of a “permit to operate” which will cover all the separate primary instruments which apply.

Within the permit, the regulator (EA) will set a number of operational conditions. These conditions will be based on the use of Best Available Techniques, referred to usually as just “BAT”.

The PPC permit conditions will also usually put a responsibility on the developer to take action to:-

  • ensure that energy is used efficiently,
  • avoid or minimise waste and limit emissions,
  • prevent accidents and limit their consequences
  • provide continuous improvement as the available technology improves with time.

AD plant technologies are normally seen as BAT complaint processes, however each plant will need to be judged individually and within the setting of the local environmental conditions.

 

The Animal By-Product Order (ABPO)

The EU Animal By-Products Regulations (ABPR) have strengthened the regulations that govern the processing and disposal of animal by-products.

These ABP regulations require the processing of all food wastes to strict requirements designed to prevent future spread of infections which might otherwise survive waste processing methods such as Anaerobic Digestion to threaten re-infection of more livestock.

There will be strong points to make in favour of anaerobic biological treatment schemes which are well suited to the required degree of pasteurisation required of all the material processed.

The ABPR puts stringent controls on the process requirements, including

  • Time and minimum temperature and residence time at the required elevated temperature.
  • Strict segregation of clean and dirty sides of the process and facilities for vehicle washing
  • Two stage process - under certain conditions.

The Regulation EC 1774/2002 (the ‘EU Animal By-Products Regulation’) has applied since 1 May 2003.

Specifically the ABPR permits AD plants to treat food/catering waste as well as low risk animal by-products as long as they are subjected to an elevated temperature of at least 70°C for 1 hour in a closed system.

 

 

[Home] [AD Intro] [Contact Us/Legal] [AD in Agriculture] [On Farm AD & Central] [Regs Requirements] [Example Agricultural Anaerobic Digestor] [Biogas Construct Manual.] [History] [AD Plants UK] [AD MSW WW] [AD Processes] [AD Articles] [Downloads] [Site Map] [Partner Sites] [Links] [Events] [AD News] [FAQs] [AD Suppliers] [Books for Sale] [Press Release] [Calculate GHG] [A D Consultants] [FREE Bonus]